Turner Delivers One Solution During Annual Outages in Texas
- An array of Turner’s divisions and service groups worked seamlessly together during outages at Dow Chemical and Arkema in Beaumont, Texas.
- The outages were a true “One Solution” effort from Turner providing maintenance, specialized welding, crane and rigging, NDE, inspection, and specialty services to the clients.
- Both projects were completed on time with zero OSHA recordables.
Location: Beaumont, Texas
project quick facts
Dow Annual Outage
The scope of the Dow Project was to merge the new MNB(MonoNitrobenzene) unit with the existing Aniline unit.
- Duration: 14 Days
- Hours Worked: 13,367
- OSHA Recordables: ZERO
- First Aids: ZERO
- Dropped Objects: ZERO
- Weld Repairs: ZERO
- Services Provided: Maintenance, Specialized Welding Services, Crane and Rigging, NDE and Inspection, Bundle Extraction, and Bolt Torquing.
Arkema Annual Outage
The scope of the Arkema project was to perform a complete plant outage and two capital projects consisting of five large vessel replacements.
- Duration: 30 Days
- Hours Worked: 26,971
- OSHA Recordables: ZERO
- Dropped Objects: ZERO
- Post Start Up Leaks: ZERO
- Services Provided: Maintenance, Specialized Welding Services, Crane and Rigging, Specialty Services, NDE and Inspection.