Turner Delivers One Solution During Annual Outages in Texas

  • An array of Turner’s divisions and service groups worked seamlessly together during outages at Dow Chemical and Arkema in Beaumont, Texas. 
  • The outages were a true “One Solution” effort from Turner providing maintenance, specialized welding, crane and rigging, NDE, inspection, and specialty services to the clients. 
  • Both projects were completed on time with zero OSHA recordables. 

Location: Beaumont, Texas

project quick facts

Dow Annual Outage

The scope of the Dow Project was to merge the new MNB(MonoNitrobenzene) unit with the existing Aniline unit. 

  • Duration: 14 Days  
  • Hours Worked: 13,367 
  • OSHA Recordables: ZERO 
  • First Aids: ZERO 
  • Dropped Objects: ZERO 
  • Weld Repairs: ZERO 
  • Services Provided: Maintenance, Specialized Welding Services, Crane and Rigging, NDE and Inspection, Bundle Extraction, and Bolt Torquing. 

Arkema Annual Outage

The scope of the Arkema project was to perform a complete plant outage and two capital projects consisting of five large vessel replacements. 

  • Duration: 30 Days 
  • Hours Worked: 26,971 
  • OSHA Recordables: ZERO 
  • Dropped Objects: ZERO 
  • Post Start Up Leaks: ZERO 
  • Services Provided: Maintenance, Specialized Welding Services, Crane and Rigging, Specialty Services, NDE and Inspection. 