ExxonMobil – Polypropylene Growth Project

ExxonMobil – Polypropylene Growth Project

Location: Baton Rouge, Louisiana

  • Contract Value: 260MM
  • Contract Type: EPC Consortium
  • Workhours: 2.9MM
  • Duration: January 2019 – September 2022
  • Percentage of Labor Self Performed: 95%
  • Subcontractors: 32

turner self-performed

  • Site Preparation/Excavation: Excavated roughly 55,300 cubic yards of dirt
  • Civil: 14,740 cubic yards of concrete and 1,210 tons of rebar
  • Structural Steel: 3,430 tons split between new structures and additions to existing ones
  • Equipment: Setting 366 total pieces of process equipment and 7 modules
  • Hydro Testing: 631 hydro test packages
  • Painting: 34,180 square feet of paint touch up
  • Insulation: 29,600 linear feet of piping insulation
  • Scaffolding: Erected over 592,000 leg feet of scaffold
  • Piping: 166,396 linear feet of piping
  • Fabricated, barged 7 modules from our 415 Yard